Highly Efficient Clean Energy Generation
SHPP Vranovska started the operation in 2017, as a part of the project for construction of four SHPPs on river Topolka water stream. The project consists of 3 SHPPs connected in cascade and a separate plant, with total installed power generation of 7.6 MW. The project is to be finished in 2019.
Project Description
- Installed water flow of 0.9 m3/s with gross head of 114m
- Complete electro-technical solution for four-nozzle Pelton-turbine rated at 820 kW
- Electrical equipment including: 1.000 kVA transformer, 20 kV switchgear, low-voltage switchboard automation, control and monitoring (SCADA)
- Machine automation system with process visualization
Customer Benefits
- Professional consulting, engineering, erection and commissioning
- System and plant assessment
- Delivery and fitting of spare parts
- Eco-friendly: renewable energy production with a high degree of efficiency
- Central power plant operation