SHPP Vranovska

  • FeroInvest delivered a complete customized turnkey solution and was responsible for engineering, supply, assembly and commissioning of the plant.
  • Supply scope included the turbines, generators and complete electrical equipment, as well the entire plant control system.
  • Pelton turbine with four nozzles produced by FeroInvest
Annual Electricity Supply (MWh)
2500
Annual Reduction of CO2 (t)
2000
Maximum power operation (h)
2500

Find out more about our projects

Highly Efficient Clean Energy Generation

SHPP Vranovska started the operation in 2017, as a part of the project for construction of four SHPPs on river Topolka water stream. The project consists of 3 SHPPs connected in cascade and a separate plant, with total installed power generation of 7.6 MW. The project is to be finished in 2019.

Project Description

  • Installed water flow of 0.9 m3/s with gross head of 114m
  • Complete electro-technical solution for four-nozzle Pelton-turbine rated at 820 kW
  • Electrical equipment including: 1.000 kVA transformer, 20 kV switchgear, low-voltage switchboard automation, control and monitoring (SCADA)
  • Machine automation system with process visualization

Customer Benefits

  • Professional consulting, engineering, erection and commissioning
  • System and plant assessment
  • Delivery and fitting of spare parts
  • Eco-friendly: renewable energy production with a high degree of efficiency
  • Central power plant operation